As to both of them, we think the city is concluded by the action of its own officer, the engineer, who was also, by the terms of the contract, authorized by the parties to it to decide these questions.
It may be conceded that there is room for doubt, whether the wells were to be twelve feet in diameter after they were completed by the building of the curbing, or were to be twelve feet in diameter when the shaft was first sunk, and the nine inch curbing built inside was not to be taken into the account in ascertaining the diameter. The language, we think, rather favors the latter construction.
Source: Wikisource

Portrait of Samuel Freeman Miller Samuel Freeman Miller Omaha v. Hammond — Opinion of the Court

The whole work was to be done under his supervision and to his satisfaction. It is proved that the depth of the main shaft was determined by him in reference to the length of the hose to be inserted in it. And the auxiliary shaft was also sunk under his direction and with his approval. The city cannot now complain that it was done as he directed.
Source: Wikisource

Get perspective with Kwize: daily news enlightened by great literature