National Institute for Occupational Safety and Health, NIOSH Manual of Analytical Methods… (1994)
“ Analyze three quality control blind spikes and three analyst spikes to insure that the calibration graph and DE graph are in control. MEASUREMENT: 12. 13. Set gas chromatograph according to manufacturer's recommendations and to conditions given on page 1457-1. Inject sample aliquot manually using solvent flush technique or with autosampler. NOTE: If peak area is above the linear range of the working standards, dilute with CS 2, reanalyze, and apply the appropriate dilution factor in calculations. Measure peak area. ”
