Thomas Forester, Rambles in the Islands of Corsica and Sardinia
“ Newall and Co., after completing their contract for one half, 1250 miles, of the Transatlantic cable, lost no time in proceeding with the manufacture of the Mediterranean cables at their works in Birkenhead. Towards the end of August, the African cable, with some portion of the Malta cable, was shipped in the Mersey aboard their steamship Elba, the vessel before employed in laying down the cable between Varna and Constantinople. It should be mentioned that the African cable contained four wires, so that it was more ponderous and less flexible than the Atlantic cable, which has only one. ”