A large volume would be required to deal fully with the manufacture of the many different parts of a locomotive and to describe the various processes in the foundries, smithy and forge, boiler-shop, machine shop, and erecting shops. Moreover the methods of construction of the various parts differ considerably in a small works, where perhaps only one or two engines are built at a time, from those in a large works, where from a dozen to fifty engines of the same class may be built to a single order.
Source: Wikisource

Portrait of Ernest Leopold Ahrons Ernest Leopold Ahrons Steam Locomotive Construction and Maintenance (1921)

For the purposes of quick erection, as many men as possible work together on the same engine under a leading hand or “chargeman,” as he is termed. The chargeman is responsible for the whole work on a single engine, and frequently may have two or three engines in hand at once. He is in turn responsible to the shop foreman, who superintends the whole of the work done in the shop, in which a dozen to twenty engines may be in course of erection.
Boiler, Smokebox, etc. The engine is now ready for the boiler to be placed on the frames.
Source: Wikisource

Portrait of Ernest Leopold Ahrons Ernest Leopold Ahrons Steam Locomotive Construction and Maintenance (1921)

In many works much of the planing of the various outer surfaces is done first, using the scribed lines as a guide, and then the cylinders are set down on the bed of a boring machine on one of the planed surfaces and bored. The centre line of the bore of the cylinder is the datum line to which all other dimensions refer, and therefore some works consider it preferable to bore the cylinders before planing them.