John Timperley, An Account of the Harbour and Docks at Kingston-upon-Hull (1842)
“ If there are many large vessels to pass, it is sometimes found necessary to draw off the water one or two feet, so that the surface on the two sides may become level sooner, and the gates continue longer open, of which advantage is also taken to pass craft without the labour and delay of lockage ; but this practice is never resorted to, except in cases of necessity, as the deposit of mud in the dock is much increased by it, the water abstracted, which is comparatively pure from time having been allowed for subsidence, being replaced by the very muddy water of the tide. ”