Pile (construction)

Definition and stakes

William Hemingway Mills,  Railway Construction

“ Great care must be used with the first two or three lengths of any screw pile to ensure the pile taking a correct or true vertical position. Each series of screw piles should be properly braced together to obtain stability under moving loads. ”
Source: Gutenberg

Portrait of George L. Vose George L. Vose,  Handbook of Railroad Construction…

“ The fact that a pile refuses to enter further, does not show that it has reached a bed strong enough to bear the required load; for though it may bear upon a solid bottom, or resist penetration by side friction, when the load has been for some time upon the pile, it may be found too weak to stand. Piles have in some cases refused to enter the ground from the blow of a 1,500 lbs. ram, falling twenty feet, when first driven, and have afterwards gone down three feet from a ram of 1,000 lbs. ”
Source: Gutenberg

Portrait of Thomas Curtis Clarke Thomas Curtis Clarke,  The American Railway: Its Construction…

“ Bridge Pier Founded on Piles.
The ordinary method of forcing a pile into the ground is by repeated blows of a hammer of moderate weight; better success being obtained by frequent blows of the hammer, lifted to a slight elevation, than results from a greater fall, there being danger also in the latter case of injuring the material of the pile.
”