Mont Cenis Tunnel

Definition and stakes

Robert Routledge,  Discoveries and Inventions of the Nineteenth Century

“ One of the great difficulties of the work is shared with the Mont Cenis Tunnel, the other is peculiar to the present undertaking. The Alps above the one, and the sea above the other, necessarily prevent the use of shafts. The work must be carried on from each end; and all the débris excavated must be brought back the whole length of the boring, and all the air to be breathed by the workmen must be forced in. The provision of a fit atmosphere is a mere matter of detail. ”
Source: Gutenberg

James P. Boyd,  Triumphs and Wonders of the 19th Century…

“ The advance in methods of tunnel surveying is as great and nearly as important. Progress in excavating tunnels is necessarily slow, because the working face is so small that only a few men can work there at a time, and the rate of advance depends upon them. As an illustration: although the Mont Cenis tunnel belongs to the latter half of this century, the first blast being made in 1857, yet for the first four years hand drilling was employed, when the average progress was about nine inches per day. ”
Source: Gutenberg

Portrait of Henry White Warren Henry White Warren,  Among the Forces

“ We do works vastly greater. We drive tunnels three times as long for double-track railways through rock that is held down by an Alp. We use common air to drill the holes and a thin gas to break the rock. The Mont Cenis tunnel required the removal of 900,000 cubic yards of rock. Near Dover, England, 1,000,000,000 tons of cliff were torn down and scattered over fifteen acres in an instant. ”
Source: Gutenberg

Get perspective with Kwize: daily news enlightened by great literature