George Hebard Maxwell,
Our National Defense: The Patriotism of Peace
“ It is a fact capable of absolute demonstration that a large portion of the damage [Pg 302] resulting from those floods was due to the stubborn refusal of the Army engineers to approve or adopt any plan for flood control that would supplement the levee system by source stream control of the floods on the upper tributaries, and by controlled outlets and spillways and auxiliary flood water channels in the lower valley. ”
