Construction train

Definition and stakes

William Hemingway Mills,  Railway Construction

“ Valuable and interesting statistics have from time to time been recorded, with a view to ascertain the average life of a steel rail, by obtaining the number of million tons of train load which it would sustain before it became worn down to such an extent as to be no longer of service on the line. It will be readily understood that the rate of wear of a steel rail will depend not only on the weight and section of the rail itself, but on the class of rolling-stock, and the description of traffic it has to carry. ”
Source: Gutenberg

William Hemingway Mills,  Railway Construction

“ An arriving goods train is first drawn out of the main-traffic lines into one of the shunting lines, and then handed over to the staff of men in charge of the sorting operations, who at once mark the waggons according to the number or designation of the particular siding into which they have to be placed. A suitable engine is generally set apart for this work, and in a very short time the entire train is divided out by one or more waggons at a time, and distributed into the various sidings, representing different sections of the line, or groups to be handed over to neighbouring railways. ”
Source: Gutenberg

William Francis Bailey,  The Story of the First Trans-Continental Railroad

“ Then (p. 054) comes the main body of the army, placing the ties, laying the track, spiking down the rails, perfecting the alignment, ballasting and dressing up and completing the road for immediate use. Along the line of the completed road are construction trains pushing 'to the front' with supplies. The advance limit of the rails is occupied by a train of long box-cars with bunks built within them, in which the men sleep at night and take their meals. Close behind this train come train loads of ties, rails, spikes, etc., which are thrown off to the side. ”
Source: Gutenberg

Get perspective with Kwize: daily news enlightened by great literature