Railway cutting

Definition and stakes

Various,  Notes and Queries, Vol. IV, Number 112…

“ There is one in the railway valley, below Chipsted Church, some 100 feet deep; I have never known it dry. Within a stone's throw of this last, the London and Brighton railway runs in a very deep cutting,—I have been told the deepest railway cutting in England,—and great fears were entertained that this deep cutting would drain this and several neighbouring wells. The only way, however, in which the railway affected the wells, was to cut right through one, parts of which may still be seen in the embankment.
It is not always the case that a deep well will drain its shallow neighbours.
”
Source: Gutenberg

William Hemingway Mills,  Railway Construction

“ In cases of soft or treacherous ground, timber-piling or wide bed-courses of cement concrete are necessary to form firm foundations for culverts. Drains and streams which are intersected by a railway cutting have to be dealt with according to their size and their height above the finished rail level. The water from a small drain or field spring may be conducted in pipes down the slope of the cutting into the water-table, or side drain, at formation level, and will be thus carried away to the lower level at the entrance of the cutting. ”
Source: Gutenberg

Edward Adolph Hermann,  Steam Shovels and Steam Shovel Work

“ Standard gage railway cars cannot be used in thorough cutting, as the track cannot be laid in front of a point at right angles to the post of the steam shovel, and when the track ends there the crane cannot swing back far enough to load the car. Thorough cutting should be avoided if possible, the cost due to the loss of time in switching cars, relaying tracks, extra horses and men, etc., makes it more expensive than excavating from a side cut. ”
Source: Gutenberg

Get perspective with Kwize: daily news enlightened by great literature