Tappan Wentworth,
Report of the Hoosac Tunnel and Troy and Greenfield Railroad…
“ In this anticipation, ten vertical drilling machines were constructed to work in the shaft area and a compressor with two cylinders was provided to furnish the power for operating them. The want of drilling machines at the East End became so urgent, that these vertical ones were changed to horizontals, and used at that point, and the sinking of the shaft by hand-drilling still continues. But if the experiments now in progress at the East End with the new drilling machine shall demonstrate its superiority over [21] hand labor, the machine will doubtless be introduced into the shaft. ”
